Scheduling of Resource-Constrained Projects
Autor Robert Kleinen Limba Engleză Paperback – 11 oct 2012
The book is divided into two parts. In Part I, the project management process is described and the management tasks to be accomplished during project planning and control are discussed. This allows for identifying the major scheduling problems arising in the planning process, among which the resource-constrained project scheduling problem is the most important. Part II deals with efficient computer-based procedures for the resource-constrained project scheduling problem and its generalized version. Since both problems are NP-hard, the development of such procedures which yield satisfactory solutions in a reasonable amount of computation time is very challenging, and a number of new and very promising approaches are introduced. This includes heuristic procedures based on priority rules and tabu search as well as lower bound methods and branch and bound procedures which can be applied for computing optimal solutions.
| Toate formatele și edițiile | Preț | Express |
|---|---|---|
| Paperback (1) | 1175.12 lei 6-8 săpt. | |
| Springer – 11 oct 2012 | 1175.12 lei 6-8 săpt. | |
| Hardback (1) | 1179.46 lei 6-8 săpt. | |
| Springer Us – 30 noi 1999 | 1179.46 lei 6-8 săpt. |
Preț: 1175.12 lei
Preț vechi: 1433.08 lei
-18%
Puncte Express: 1763
Preț estimativ în valută:
207.79€ • 244.98$ • 179.34£
207.79€ • 244.98$ • 179.34£
Carte tipărită la comandă
Livrare economică 19 martie-02 aprilie
Specificații
ISBN-13: 9781461370932
ISBN-10: 1461370930
Pagini: 388
Ilustrații: XVII, 369 p.
Dimensiuni: 155 x 235 x 21 mm
Greutate: 0.59 kg
Ediția:Softcover reprint of the original 1st ed. 2000
Editura: Springer
Locul publicării:New York, NY, United States
ISBN-10: 1461370930
Pagini: 388
Ilustrații: XVII, 369 p.
Dimensiuni: 155 x 235 x 21 mm
Greutate: 0.59 kg
Ediția:Softcover reprint of the original 1st ed. 2000
Editura: Springer
Locul publicării:New York, NY, United States
Public țintă
ResearchCuprins
1 The Project Management Process.- 2 Project Planning and Control.- 3 Resource-Constrained Scheduling Problems.- 4 Lower Bound Methods.- 5 Heuristic Procedures.- 6 Exact Procedures.- 7 Computational Experiments.- 8 Summary and Conclusions.- References.