Precedence and Arrow Networking Techniques for Construction

Autor Robert B. Harris, Mchenry Harris
en Limba Engleză Paperback – 11 aug 1978
Two important scheduling techniques for modern construction management--the precedence technique and the arrow technique--are developed and analyzed. The parallel treatment of these two applications presents a basis of theory and practice for the civil engineering student and the practicing project manager. Introduces the concept of the scheduling plan as a design process. Shows the steps for developing the list of activities as the basis for any networking technique. Gives computations for arrow and precedence diagrams. Covers practical techniques for making time-cost adjustments to early start schedules. Concludes with discussion of applications of techniques in the context of real-life projects.
Citește tot Restrânge

Preț: 160863 lei

Preț vechi: 220361 lei
-27%

Puncte Express: 2413

Carte tipărită la comandă

Livrare economică 24 octombrie-07 noiembrie

Livrare prin curier în România Termenul estimat este afișat lângă disponibilitate.
Transport gratuit pentru acest produs Plată online sau ramburs, în funcție de opțiunile comenzii.
Retur gratuit în 14 zile Comandă securizată și suport în română.

Specificații

ISBN-13: 9780471041238
ISBN-10: 0471041238
Pagini: 444
Dimensiuni: 152 x 229 x 26 mm
Greutate: 0.72 kg
Editura: Wiley
Locul publicării:Hoboken, United States

Notă biografică

Robert B. Harris was an American multihull sailboat designer.

Cuprins

Introduction.

Project Breakdown.

Basic Arrow Diagraming.

Basic Precedence Diagraming.

Establishing Activity Durations.

Scheduling Computations for Arrow Networks.

Scheduling Computations for Precedence Networks.

Communicating the Schedule.

Project Control.

Time-Cost Adjustments.

Resource Leveling.

Program Evaluation and Review Technique (PERT).

Overlapping Networks.

Index.

Descriere

Two important scheduling techniques for modern construction management--the precedence technique and the arrow technique--are developed and analyzed. The parallel treatment of these two applications presents a basis of theory and practice for the civil engineering student and the practicing project manager.