Construction Scheduling, Cost Optimization and Management
Autor Hojjat Adeli, Asim Karimen Limba Engleză Paperback – 12 dec 2019
Preț: 606.15 lei
Preț vechi: 713.12 lei
-15%
Puncte Express: 909
Carte tipărită la comandă
Livrare economică 09-23 ianuarie 27
Livrare prin curier în România Termenul estimat este afișat lângă disponibilitate.
Transport gratuit pentru acest produs Plată online sau ramburs, în funcție de opțiunile comenzii.
Retur gratuit în 14 zile Comandă securizată și suport în română.
Specificații
ISBN-13: 9780367863807
ISBN-10: 0367863804
Pagini: 338
Dimensiuni: 156 x 234 x 18 mm
Greutate: 0.65 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
ISBN-10: 0367863804
Pagini: 338
Dimensiuni: 156 x 234 x 18 mm
Greutate: 0.65 kg
Ediția:1
Editura: CRC Press
Colecția CRC Press
Public țintă
Postgraduate and ProfessionalCuprins
1. Review of Construction Scheduling and Management Methods. 2. Neural Dynamics Model of Adeli and Park and its Application to Engineering Design. 3. A General Mathematical Formulation for Scheduling of Construction Projects with Construction Cost Optimization. 4. Solution of Construction Scheduling and Cost Optimization with Neural Dynamics. 5. An Object-Oriented Information Model for Construction Project Management. 6. CONSCOM: An Object-Orient Construction Scheduling and Change Management System. 7. Integrated Management Environment and User Interface. 8. Regularization Neural Network for Construction Cost Estimation. References. Appendix Nomenclature.
Notă biografică
Hojjat Adeli is Professor of Civil and Environmental Engineering and Geodtic Science and Director of Knowledge Engineering Lab at The Ohio State University. He is a leading, world-renowned researcher and inventor and author of 340 research publications including nine highly acclaimed and pioneering books in the general field of computer-aided engineering (CAE). His ground-breaking research has appeared in 54 different scholarly journals covering many disciplines and had a profound impact on the direction of CAE research. He is the Editor-in-Chief of two prestigious journals Computer-Aided Civil and Infrastructure Engineering and Integrated Computer-Aided Engineering. He is the recipient of numerous awards and honours. In 1998, he was awarded the University Distinguished Scholar Award by The Ohio State University.
Recenzii
'Here is a practical guide for those involved in the construction industry, including engineers, contractors, and project managers.'- Business Review May-June 2002
Descriere
This book provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization.