A Preliminary Study of Using the SEI's Capability Maturity Model to Set Statistical Control Bounds on DOD Contractor Cost and Schedule Performance Autor Jeffrey A Schaefer 20 sep 2012 Paperback Preț: 94.69 lei 6-8 săpt.