Cantitate/Preț
Produs
Critical Path Analysis in Practice: Collected papers on project control de Gail Thornley

Critical Path Analysis in Practice: Collected papers on project control

Editat de Gail Thornley
152927 lei 186497 lei -18%
  • Economic11-25 ianuarie 27 152927 lei
  • Express înainte de Crăciun08-12 decembrie 167983 lei

Alegi livrarea în coș.

Adaugă în listă2294 Puncte Express
  • Transport gratuit pentru acest produs
  • Plată online sau ramburs
  • Retur gratuit în 14 zile

Despre carte

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.

Detalii

ISBN-13
9780415264723
ISBN-10
0415264723
Editura
Taylor & Francis
Colecția
Routledge
Ediția
1
Pagini
166
Dimensiuni
138 x 216 x 18 mm
Greutate
0.24 kg
Locul publicării
Oxford, United Kingdom

Cuprins

Part I Review of Basic CPA Methods; 1. The Scope of the Method, D. WILLIAMS; 2. Introduction to the Basic Method, D. WILLIAMS; 3. The Method of Potentials, J. A. CARRUTHERS; Part II Early Problems of Implementation; 4. Introducing CPA into an Organization, R. COKER; 5. Optimum Level of Detail, H. WALTON; 6. The Use and Abuse of Computers, D. WILLIAMS; Part III Further Aspects of the Technique; 7. ::; 8. Probabilistic Times, J. A. CARRUTHERS; 9. Probabilistic Networks, C. STAFFURTH; ch0010 Network-based Cost Control, P. M. USHER, D. W. FORSYTH; Part IV Large Networks; 11. Major Problem Areas, E. L. BUESNEL; 12. Network Preparation, H. WALTON; 13. Monitoring, D. J. ARMSTRONG; 14. Communication, E. G. TRIMBLE; 15. Organization, R. C. J. TAYLOR; 16. Education and Training, E. L. BUESNEL; Part V Alternative Approaches to Network Problems; 17. Linear Programming and CPA, S. VAJDA; 18. A Note on the Transportation Formulation of CPA, J. A. CARRUTHERS;

Descriere

Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.