Accelerated Bridge Construction: Best Practices and Techniques
Autor Mohiuddin Ali Khanen Limba Engleză Paperback – 13 aug 2014
- Describes design methods for accelerated bridge substructure construction; reducing foundation construction time and methods by using pile bents
- Explains applications to steel bridges, temporary bridges in place of detours using quick erection and demolition
- Covers design-build systems' boon to ABC; development of software; use of fiber reinforced polymer (FRP)
- Includes applications to glulam and sawn lumber bridges, precast concrete bridges, precast joints details; use of lightweight aggregate concrete, aluminum and high-performance steel
Preț: 602.63 lei
Preț vechi: 662.23 lei
-9%
Puncte Express: 904
Carte tipărită la comandă
Livrare economică 02-16 iulie
Livrare prin curier în România Termenul estimat este afișat lângă disponibilitate.
Transport gratuit pentru acest produs Plată online sau ramburs, în funcție de opțiunile comenzii.
Retur gratuit în 14 zile Comandă securizată și suport în română.
Specificații
ISBN-13: 9780124072244
ISBN-10: 0124072240
Pagini: 656
Dimensiuni: 191 x 235 x 30 mm
Greutate: 1.25 kg
Ediția:New.
Editura: ELSEVIER SCIENCE
ISBN-10: 0124072240
Pagini: 656
Dimensiuni: 191 x 235 x 30 mm
Greutate: 1.25 kg
Ediția:New.
Editura: ELSEVIER SCIENCE
Public țintă
Construction Engineers, Construction managers, Architects, and Architectural and civil draftersCuprins
SECTION 1 INNOVATIVE CONSTRUCTION METHODSChapter 1 Introduction to Modern Accelerated Bridge Construction (ABC)Chapter 2 Recent Developments in ABC Concepts Chapter 3 Research and Training in ABC Structural Systems Chapter 4 Innovative ABC Techniques
SECTION 2 RAPID CONSTRUCTION ISSUESChapter 5 Modular Bridge Construction Issues Chapter 6 Rapid Bridge Insertions Following FailuresChapter 7 ABC Planning and Resolving ABC Issues
SECTION 3 MODULAR BRIDGESChapter 8 Prefabrication of the SuperstructureChapter 9 Prefabrication of the Substructure And Construction IssuesChapter 10 Alternative ABC Methods and Funding Evaluation Chapter 11 A Review of Chapters, River Bridges and Conclusions
SECTION 2 RAPID CONSTRUCTION ISSUESChapter 5 Modular Bridge Construction Issues Chapter 6 Rapid Bridge Insertions Following FailuresChapter 7 ABC Planning and Resolving ABC Issues
SECTION 3 MODULAR BRIDGESChapter 8 Prefabrication of the SuperstructureChapter 9 Prefabrication of the Substructure And Construction IssuesChapter 10 Alternative ABC Methods and Funding Evaluation Chapter 11 A Review of Chapters, River Bridges and Conclusions